The passengers will change to the bullet train or subway and don’t need to go out of terminal station after they landed in the Qingdao new airport in the future. As the key part of zero-transfer of comprehensive transportation center of new airport, high subway station building recently began its main body construction, which is expected to complete station building and tunnel main body construction in the end of 2017.
The China new airport bullet train and subway station-building project is undertaken by the China Railway Construction Engineering Group. Part of them is beneath the flying area, terminal station and office area; it can be divided into the bullet train area and subway area. The bullet train part is the Qingdao airport station project of Jinan-Qingdao bullet train project ready to built, the total length is 1,850 meters; the comprehensive construction area is about 73,100 square meters. The subway part has two parts: Qingdao Eastern Shandong international airport railway transportation building engineering airport station, and open excavation area project, including the subway line 8 and intercity express line.